Next project

The Projects at fourth street have been going since I moved in it seems like.  There lots of things that need fixing here and so I’ve been starting on them.  So far there’s a new roof and patio cover that are almost done.  Pictures from that will be online shortly.  I’m getting into some electrical work on the detached garage and then just organizing all my stuff that’s in the garage.  Hopefully I get better before pictures on that stuff as well as the shower that needs to be replaced.

Tagless Software Changed again

I decided to swap out the software that I use to run Tagless to something simpler.  Joomla is an amazing piece of software.  I decided it was to much for what I’m currently using on Tagless though.  I switched over to wordpress since it is much more basic.